{"id":1035,"date":"2007-11-05T16:48:51","date_gmt":"2007-11-05T14:48:51","guid":{"rendered":"http:\/\/www.miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/"},"modified":"2007-11-05T16:48:51","modified_gmt":"2007-11-05T14:48:51","slug":"terminal-aeropuerto-malaga","status":"publish","type":"post","link":"https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/","title":{"rendered":"Magdalena \u00c1lvarez, ha visitado las obras del futuro edificio Terminal del Aeropuerto de M\u00e1laga"},"content":{"rendered":"<p>Una vez finalizada, el conjunto del \u00e1rea terminal tendr\u00e1 capacidad para<br \/>\nasistir a 9.000 pasajeros a la hora, duplicando as\u00ed la capacidad actual.<br \/>\n<!--more--><br \/>\nLa Ministra de Fomento visita la obra del<br \/>\nfuturo edificio Terminal del Aeropuerto de<br \/>\nM\u00e1laga<\/p>\n<p>\u2022\u00a0 Con una inversi\u00f3n superior a los\u00a0 1.100 millones de euros, el<br \/>\nPlan M\u00e1laga articula todas las actuaciones necesarias que<br \/>\nllevar\u00e1n al Aeropuerto de M\u00e1laga a experimentar la mayor<br \/>\ntransformaci\u00f3n de su historia<br \/>\n\u2022\u00a0 La construcci\u00f3n de la obra civil del nuevo edificio Terminal, su<br \/>\nurbanizaci\u00f3n y accesos, suponen una inversi\u00f3n de m\u00e1s de 200<br \/>\nmillones de euros<\/p>\n<p>La Ministra de Fomento, Magdalena \u00c1lvarez, ha visitado hoy las obras<br \/>\ndel futuro edificio Terminal del Aeropuerto de M\u00e1laga, que se iniciaron<br \/>\nen mayo de 2005. La construcci\u00f3n de la obra civil del nuevo edificio, su<br \/>\nurbanizaci\u00f3n y accesos, suponen una inversi\u00f3n de m\u00e1s de 200 millones<br \/>\nde euros.<\/p>\n<p>El nuevo edificio Terminal se incluye en la primera fase del Plan<br \/>\nM\u00e1laga, que, con una inversi\u00f3n total de m\u00e1s de 1.100 millones de<br \/>\neuros, articula todas las actuaciones necesarias que llevar\u00e1n al<br \/>\nAeropuerto de M\u00e1laga a experimentar la mayor\u00a0 transformaci\u00f3n de su<br \/>\nhistoria.<\/p>\n<p>El nuevo edificio Terminal, con\u00a0 una superficie de aproximadamente<br \/>\n250.000 metros cuadrados y 86 mostradores de facturaci\u00f3n, estar\u00e1<br \/>\nunido a la Terminal Pablo Ruiz Picasso (T2), de forma que constituir\u00e1n<br \/>\nen su conjunto un edificio \u00fanico, y se prolonga hacia el norte mediante<br \/>\nun dique, paralelo a la plataforma de estacionamiento de aeronaves y<br \/>\ncon 20 puertas de embarque,\u00a0 que permitir\u00e1n atender hasta 12<br \/>\naeronaves en conexi\u00f3n y otras 8 en remoto.<\/p>\n<p>La obra civil del edificio Terminal se finalizar\u00e1 en septiembre de 2008 y<br \/>\nsu puesta en servicio est\u00e1 prevista para el segundo\u00a0 trimestre de 2009,<br \/>\nuna vez se hayan realizado las pruebas necesarias. A partir de ese<br \/>\nmomento, el conjunto del \u00e1rea Terminal del\u00a0 Aeropuerto de M\u00e1laga<br \/>\ntendr\u00e1 capacidad para asistir a 9.000 pasajeros a la hora, lo que<br \/>\nduplicar\u00e1 la capacidad actual y supondr\u00e1 una importante mejora de los<br \/>\nservicios proporcionados al pasajero.<\/p>\n<p>ACTUACIONES EN SERVICIO<br \/>\nEntre las actuaciones del Plan M\u00e1laga ya en servicio, destaca el nuevo<br \/>\nedificio de aparcamiento y accesos provisionales, que se puso en<br \/>\nservicio el pasado mes de julio. El aparcamiento, de siete plantas y<br \/>\nunas 2.500 plazas, fue inaugurado por la ministra de Fomento el mismo<br \/>\nd\u00eda que entraron en funcionamiento la nueva Terminal de Aviaci\u00f3n<br \/>\nGeneral y la remodelaci\u00f3n y ampliaci\u00f3n de la Terminal T1. Nueve<br \/>\nnuevos mostradores de facturaci\u00f3n\u00a0 (uno de ellos para equipajes<br \/>\nespeciales), que se suman a los 20\u00a0 existentes hasta entonces, un<br \/>\ndique de embarque con dos nuevas puertas y un nuevo hip\u00f3dromo de<br \/>\nrecogida de equipajes son algunas\u00a0 de las mejoras derivadas de la<br \/>\nremodelaci\u00f3n de la T1 que redundan desde este verano en el servicio<br \/>\nprestado al pasajero.<\/p>\n<p>Estas tres grandes actuaciones incluidas en el Plan M\u00e1laga son las<br \/>\n\u00faltimas puestas en servicio, pero no\u00a0 las \u00fanicas pues son m\u00e1s las que<br \/>\nse han ejecutado, desde abril de 2004, para aumentar la capacidad de<br \/>\nlas instalaciones aeroportuarias, como\u00a0 la ampliaci\u00f3n de la plataforma<br \/>\nde estacionamiento de aeronaves, los nuevos apartaderos de espera y<br \/>\nlas nuevas calles de salida r\u00e1pida. Una nueva zona de actividades<br \/>\naeron\u00e1uticas, el desv\u00edo del acueducto Bores, la adaptaci\u00f3n del sistema<br \/>\nde tratamiento de equipajes, que posibilita inspeccionar el 100% del<br \/>\nequipaje de bodega, la urbanizaci\u00f3n de la zona de carga y un nuevo<br \/>\nPuesto de Inspecci\u00f3n Fronteriza (PIF) completan las actuaciones m\u00e1s<br \/>\nrelevantes ya ejecutadas del Plan M\u00e1laga.<\/p>\n<p>ACTUACIONES EN EJECUCI\u00d3N<br \/>\nAdem\u00e1s del futuro edificio Terminal cuyas obras ha visitado hoy la<br \/>\nministra, se encuentran en ejecuci\u00f3n la ampliaci\u00f3n del campo de<br \/>\nvuelos, que har\u00e1 realidad la segunda pista y su balizamiento e<br \/>\ninstalaciones el\u00e9ctricas, con una\u00a0 inversi\u00f3n total de 300 millones de<br \/>\neuros, la ampliaci\u00f3n de la plataforma de la zona este o la remodelaci\u00f3n<br \/>\ndel sistema el\u00e9ctrico.<\/p>\n<p>El Plan M\u00e1laga contempla m\u00e1s y mejores accesos al Aeropuerto: el<br \/>\nnuevo acceso sur (en licitaci\u00f3n), que\u00a0 enlazar\u00e1 el \u00e1rea Terminal del<br \/>\nrecinto aeroportuario y la Autov\u00eda del Mediterr\u00e1neo, a la altura de la<br \/>\nglorieta de Guadalmar, y la conexi\u00f3n por un acceso al norte (que se<br \/>\nlicitar\u00e1 este mes), cuya obra consiste en un enlace desde la Ronda<br \/>\nOeste al Aeropuerto de M\u00e1laga. Adem\u00e1s de los nuevos accesos<br \/>\npr\u00f3ximos al aeropuerto y la bolsa de taxis, actuaci\u00f3n cuya licitaci\u00f3n fue<br \/>\naprobada en el \u00faltimo\u00a0 consejo de administraci\u00f3n de Aena por un<br \/>\nimporte de 9 millones de euros. Tambi\u00e9n en el \u00faltimo consejo se ha<br \/>\nadjudicado la estaci\u00f3n de ferrocarril integrada en el edificio Terminal<br \/>\npor 18,1 millones de euros.<\/p>\n<p>Pr\u00e1cticamente la totalidad de los m\u00e1s de 40 proyectos que incluye el<br \/>\nPlan M\u00e1laga se encuentran en servicio o en ejecuci\u00f3n.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Una vez finalizada, el conjunto del \u00e1rea terminal tendr\u00e1 capacidad para asistir a 9.000 pasajeros a la hora, duplicando as\u00ed la capacidad actual.<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[5],"class_list":["post-1035","post","type-post","status-publish","format-standard","hentry","category-malaga","tag-tecnologia","masonry-post","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Magdalena \u00c1lvarez, ha visitado las obras del futuro edificio Terminal del Aeropuerto de M\u00e1laga<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Se llama copla\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/\",\"url\":\"https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/\",\"name\":\"Magdalena \u00c1lvarez, ha visitado las obras del futuro edificio Terminal del Aeropuerto de M\u00e1laga\",\"isPartOf\":{\"@id\":\"https:\/\/miguelmoreno.org\/blog\/#website\"},\"datePublished\":\"2007-11-05T14:48:51+00:00\",\"author\":{\"@id\":\"https:\/\/miguelmoreno.org\/blog\/#\/schema\/person\/cde8639f19077551d0d59650a04b23d5\"},\"breadcrumb\":{\"@id\":\"https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/miguelmoreno.org\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Magdalena \u00c1lvarez, ha visitado las obras del futuro edificio Terminal del Aeropuerto de M\u00e1laga\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/miguelmoreno.org\/blog\/#website\",\"url\":\"https:\/\/miguelmoreno.org\/blog\/\",\"name\":\"El Blog del Sur\",\"description\":\"Cultura, conciertos, ferias, coplas...\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/miguelmoreno.org\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/miguelmoreno.org\/blog\/#\/schema\/person\/cde8639f19077551d0d59650a04b23d5\",\"name\":\"Se llama copla\",\"sameAs\":[\"https:\/\/miguelmoreno.org\/blog\",\"https:\/\/x.com\/coplasandalucia\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Magdalena \u00c1lvarez, ha visitado las obras del futuro edificio Terminal del Aeropuerto de M\u00e1laga","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/","twitter_misc":{"Escrito por":"Se llama copla","Tiempo de lectura":"4 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/","url":"https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/","name":"Magdalena \u00c1lvarez, ha visitado las obras del futuro edificio Terminal del Aeropuerto de M\u00e1laga","isPartOf":{"@id":"https:\/\/miguelmoreno.org\/blog\/#website"},"datePublished":"2007-11-05T14:48:51+00:00","author":{"@id":"https:\/\/miguelmoreno.org\/blog\/#\/schema\/person\/cde8639f19077551d0d59650a04b23d5"},"breadcrumb":{"@id":"https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/miguelmoreno.org\/blog\/terminal-aeropuerto-malaga\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/miguelmoreno.org\/blog\/"},{"@type":"ListItem","position":2,"name":"Magdalena \u00c1lvarez, ha visitado las obras del futuro edificio Terminal del Aeropuerto de M\u00e1laga"}]},{"@type":"WebSite","@id":"https:\/\/miguelmoreno.org\/blog\/#website","url":"https:\/\/miguelmoreno.org\/blog\/","name":"El Blog del Sur","description":"Cultura, conciertos, ferias, coplas...","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/miguelmoreno.org\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Person","@id":"https:\/\/miguelmoreno.org\/blog\/#\/schema\/person\/cde8639f19077551d0d59650a04b23d5","name":"Se llama copla","sameAs":["https:\/\/miguelmoreno.org\/blog","https:\/\/x.com\/coplasandalucia"]}]}},"_links":{"self":[{"href":"https:\/\/miguelmoreno.org\/blog\/wp-json\/wp\/v2\/posts\/1035","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/miguelmoreno.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/miguelmoreno.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/miguelmoreno.org\/blog\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/miguelmoreno.org\/blog\/wp-json\/wp\/v2\/comments?post=1035"}],"version-history":[{"count":0,"href":"https:\/\/miguelmoreno.org\/blog\/wp-json\/wp\/v2\/posts\/1035\/revisions"}],"wp:attachment":[{"href":"https:\/\/miguelmoreno.org\/blog\/wp-json\/wp\/v2\/media?parent=1035"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/miguelmoreno.org\/blog\/wp-json\/wp\/v2\/categories?post=1035"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/miguelmoreno.org\/blog\/wp-json\/wp\/v2\/tags?post=1035"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}